Jump to content

  • Log In with Google      Sign In   
  • Create Account


rrlangly

Member Since 05 Mar 2012
Offline Last Active Mar 16 2013 11:32 AM
-----

Posts I've Made

In Topic: math required for Adaline neural network

27 January 2013 - 03:33 PM

And what areas/courses would this mostly be taught under so I can find the books to study in-depth?


In Topic: math required for Adaline neural network

21 January 2013 - 04:08 PM

I'd have to say no.


In Topic: math required for Adaline neural network

20 January 2013 - 07:04 PM

I understand this conceptually from reading high-level descriptions, but I think I need to get to the point where I can work out a problem and see it through. So the answer is no.


In Topic: trying to plot linear equation

30 July 2012 - 08:51 PM

You are correct, it is in a loop and generates random points from -1 to 1, and then this linear function is used to "categorize" the data.

To answer the "y1 ignore", I should have put this after the line "y1 = " (which I think tells me what side of the line the point is on).

	if (y < y1)
		output = 1;
	else
		output = -1;

I substitued x = -1 and x = 1 and got these results, but I don't think I'm doing this correctly.
y1 = (-5 * x - 2) / -4
y1 = (-5 * -1 - 2) / 4
y1 = (5 -2) / -4
y1 = 3/-4

y1 = (-5 * x - 2) / -4
y1 = (-5 * 1 -2) / -4
y1 = (-5 -2) / -4
y1  = -7/-4

I'm trying to learn simple neural nets. I'm just not good at math but I can see I have to start somewheres.

In Topic: help calculating G cost of A* algorithm

18 March 2012 - 07:45 PM

I see my path taking shape, but trying to debug areas where the parent is wrong.

If a better path was found because it has a lower G cost, and then after G, H, and F scores along w/ its parent has been updated ... do I then drop it from the open list to closed list? Or does a better path found mean that better path node stays on the open list?

So far the only time I see that I ever drop a node from the open to closed list is when a node is checked for the low F score. And up until my path is screwed up, I can see when I backtrace for parent nodes, they're all on the closed list. So my path looks good from the start to point of screw-up and all those nodes are on the closed list. At the point of screwup, I see nodes on the open list.

PARTNERS