Copying a LPDIRECTDRAWSURFACE7
I''m currently writing a game in which I would need to copy an LPDIRECTDRAWSURFACE7 into another LPDIRECTDRAWSURFACE7. Is it really safe to just use the equal operator (=) for this or do I have to blit the first surface into the other?
This topic is closed to new replies.
Advertisement
Popular Topics
Advertisement